How Much Concrete for Steps?
Concrete for steps is the volume of the steps plus the slab under them. Three steps with a 7 in riser, an 11 in tread, a 4 ft width and a 6 in slab under them need about 9.7 cu ft, or 10.2 cu ft with 5% extra, which is 0.38 cubic yards. At 0.60 cu ft per bag that is 18 bags.
The formula
Gaugo models steps as a sloped slab with a triangular wedge of concrete for each step on top of it.
wedges = steps x riser x tread / 2 x width
slab = steps x sqrt(riser^2 + tread^2) x slab thickness x width
volume = (wedges + slab) x 1.05
All lengths are in feet; convert inches by dividing by 12. The 5% extra is Gaugo’s default for concrete. The slab thickness is your choice; this example uses 6 in. If your steps are poured solid, with the concrete filling right down to the ground, the volume is usually larger (from 3 steps up in this example) and the formula is different: see the solid-steps column below.
Concrete for steps (7 in riser, 11 in tread, 4 ft wide, 6 in slab)
| Steps | Cu ft before extra | Cu ft with 5% extra | Cu yd | Bags at 0.60 cu ft | Solid steps, cu ft with 5% |
|---|---|---|---|---|---|
| 2 | 6.49 | 6.81 | 0.252 | 12 | 6.74 |
| 3 | 9.73 | 10.21 | 0.378 | 18 | 13.47 |
| 4 | 12.97 | 13.62 | 0.504 | 23 | 22.46 |
| 5 | 16.21 | 17.02 | 0.630 | 29 | 33.69 |
| 6 | 19.46 | 20.43 | 0.757 | 35 | 47.16 |
The bag count uses an example yield of 0.60 cu ft per bag; use the yield on your label.
Worked example: 3 steps
- Riser: 7 in = 0.5833 ft. Tread: 11 in = 0.9167 ft. Slab thickness: 6 in = 0.5 ft.
- Wedges: 3 x 0.5833 x 0.9167 / 2 x 4 = 3.208 cu ft.
- Slope length per step: sqrt(0.5833^2 + 0.9167^2) = 1.0865 ft.
- Slab: 3 x 1.0865 x 0.5 x 4 = 6.519 cu ft.
- Total: 3.208 + 6.519 = 9.728 cu ft.
- With 5% extra: 9.728 x 1.05 = 10.214 cu ft, or 0.378 cu yd.
- Bags at 0.60 cu ft: 10.214 / 0.60 = 17.02, so 18 bags. At 0.45 cu ft per bag it is 22.70, so 23 bags.
In metric, 0.289 m³.
Solid steps
If the steps are poured solid, each step is a block as tall as its distance from the ground. Step 1 is one riser high, step 2 two risers, and so on, so the volume is width x tread x riser x n(n + 1) / 2. For 3 steps that is 4 x 0.9167 x 0.5833 x 6 = 12.83 cu ft, or 13.47 cu ft with 5% extra. Steps are often built over fill or a block form, so use the shape you actually pour.
How many steps do I need
The number of steps comes from the total rise. Divide the rise by the riser you want and round up: for a 30 in rise and a 7 in riser, 30 / 7 = 4.29, so 5 steps, and the real riser is 30 / 5 = 6 in. The riser and tread you may use are set by local rules, so check them before you build. Gaugo’s stair calculator does this arithmetic and also gives the run and angle.
Common mistakes and waste
- Forgetting the slab or landing. A landing is a separate slab; see how much concrete for a slab.
- Using the wrong width. Width runs across the steps, not up them.
- Treating a corner as straight. Steps that wrap a corner have different widths, so add each flight as its own set.
- Skipping the footing. Steps often need a footing; for small round footings, see how much concrete for a sonotube.
- Counting bags without a yield. Check the label; see how many bags of concrete per cubic yard.
Plan the whole job in Gaugo
Gaugo is a construction materials calculator for Android. It works offline for the whole job: stair geometry, concrete, rebar and forms can sit in one project, with a PDF estimate to share. Open the Gaugo construction calculator.
These numbers are planning estimates. Confirm quantities with your supplier or local rules before you order.
FAQ
How much concrete for 3 steps?
Three steps 4 ft wide with a 7 in riser, 11 in tread and 6 in slab take about 10.2 cu ft (0.38 cu yd) with 5% extra.
How much concrete for 4 steps?
The same steps with four risers take about 13.6 cu ft (0.50 cu yd) with 5% extra.
How much concrete for 5 steps?
Five steps of the same size take about 17.0 cu ft (0.63 cu yd) with 5% extra.
How much concrete for stairs?
Use the same formula with your own riser, tread, width and slab thickness. The slab thickness is a design choice, so confirm it with your plans.
How many concrete steps do I need?
Divide the total rise by the riser height and round up. A 30 in rise with a 7 in riser needs 5 steps. Check local rules for allowed riser and tread sizes.